Site Plan for a Building Permit

A site plan shows where proposed work sits on the property. It becomes especially important when setbacks, structures, equipment, property lines, easements or access affect the review.

Start My PermitSee Supported Permit Types
What to gather

Start with the record and documents you already have.

  • Property lines and basic lot dimensions
  • Existing structures and proposed work location
  • Relevant setbacks, easements, equipment or access features

Practical next steps.

  1. Use dimensions rather than relying only on a not-to-scale sketch
  2. Match the site plan to the project description and other drawings
  3. Provide professional survey or design information when the city requires it

Building departments use their own terminology, deadlines and procedures. Treat this as a practical orientation and verify the current rule with the jurisdiction that issued — or would issue — the permit.

Common questions

Site Plan for a Building Permit FAQ.

Do all building permits need a site plan?

No. The need depends on the project and jurisdiction, but exterior additions, structures and equipment locations commonly make site information more important.

Can I draw a site plan myself?

For some simple projects a jurisdiction may accept an owner-prepared drawing; other projects require professional or survey information. Follow the city's instructions.