Permit plans should explain the project clearly enough for the reviewer to understand the existing condition, proposed work and code-relevant details. The required plan set varies dramatically between a simple replacement and a structural remodel.
Building departments use their own terminology, deadlines and procedures. Treat this as a practical orientation and verify the current rule with the jurisdiction that issued — or would issue — the permit.
It depends on the project. Site, floor, structural, electrical, plumbing, mechanical or detail sheets may be required when relevant.
Some projects can use owner- or contractor-prepared drawings while others require licensed design professionals. The city determines what is acceptable.