Level 2 charging commonly adds a substantial 240-volt electrical load. The permit package can depend on charger amperage, whether it is hard-wired or receptacle-connected, existing service capacity and whether a panel upgrade is part of the job.
This guide helps you describe the project accurately. It does not replace a City determination about whether a permit, plan review, inspection or professional document is required.
The exact permit requirement depends on the work, property and current City rules. Use the scope questions on this page and confirm the requirement with the responsible building department.
This guide links to the configured Anaheim ev charger workflow because it is the closest supported project category. If your exact scope requires additional forms, plans or review, the City remains the authority.